Pre-opening checklist

Everything to have in place before your first guest

Sixteen items across the four phases of an opening. Written for Malaysia, adaptable to any property — and honest about the order things have to happen in.

Unlock the full checklist

Enter your work email and the checklist opens on this page straight away.

9–6 months out

  • Department list and station map for the whole property
  • Which standards are brand-mandated, which are local
  • Languages your opening team will actually work in
  • Regulator obligations for the market, dated

6–3 months out

  • Capture sessions with your opening heads of department
  • Sequences written for the stations that open first
  • Emergency mode configured before staff arrive
  • Induction standards ready for the first hiring wave

3 months to opening

  • Standards validated and loaded, QR plan per station
  • Trainers briefed on the station app, not on binders
  • Pre-opening trials: are the steps followed without asking?
  • Compliance evidence trail switched on

Opening week and day one

  • Every station covered by QR, in every floor language
  • Aisop answering from approved SOPs only
  • First Standard Score baseline taken and shared
  • Review queue live so the floor can flag what breaks

Pre-opening projects

Build the standards during the fit-out

Pre-opening is the only time you can write standards without fighting a live operation. We work backwards from opening day.

SOPhero turns rules into operating steps. It is not legal advice.